Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13571083

- Product Categories
- Friendly Links
Information Name: | 360 outdoor lifting machine |
Published: | 2014-10-06 |
Validity: | 365 |
Specifications: | |
Quantity: | 256.00 |
Price Description: | |
Detailed Product Description: | With the continuous development of market economy, to meet the majority of needs of rural architecture and urban low-rise residential community at home and abroad, our company has developed a lightweight portable lifts are widely used in construction sites cement, bricks, sand, stone, clay and other lifting operations, after years of trial and field operations, access to good economic results. Practice has proved that it has a compact structure, small size, light weight, low noise, high effectiveness, mobile place lightweight, safe and reliable use of results obtained advantage of users. Machine installation and operation Caution 1, when the machine is installed, to carefully check to: require each rope tie head over two and a fixed spanner wrench or plum lock. 2, the support bracket of the floor should be solid robust and reliable, can not shake; rack below the top tight with fir vertical reinforcement and beds wire for good, in order to prevent danger to fall off the machine. 3, lifts lifting should be noted that where the influential around the template, steel and other obstacles by extending its lifting operations must be removed in order to lifting operations can flow unimpeded card climbing traction and so on. 4, high-voltage wire, cement, mortar mixers, crane operations should stay away from the point 10 meters away, in order to prevent sand and gravel, bricks, shedding spatter and other phenomena. 5, equipped with two professional operators, field operations, Lifting, lifting work when all other non-personnel to enter the workplace, lifting to other personnel should leave the venue immediately a meter high, the case of pedestrian traffic should be prohibited to ensure safety . Waist and tie required when operating in the steel belts do not in the body. 6, before the job, you should turn on the power, check the transmission parts-load operation is normal, whether back to hanging a heavy pressure of 6 proportional pressure is good and observe operating system is timely and reliable. 7, in case of low voltage, you should reduce the weight lifting and lifting height to ensure normal motor load |
Admin>>>
You are the 12824 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City, Guang Cheng Electrical Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 12824 visitor
Copyright © GuangDong ICP No. 10089450, Dongguan City, Guang Cheng Electrical Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility